You are here: Skip Navigation LinksCommercial > Case Studies > Commercial

Commercial

Almarai, Central Processing Plant Phase 2, Al-Kharj, K.S.A

Dodd Group and our sister company 3CL were successful in a combined bid to complete the design, installation and commissioning of the Electrical and Air Conditioning Systems for the construction of Almarai’s new phase 2 central processing plant.

almaraiOur scope covers the complete air conditioning to process areas, comfort cooling to offices and laboratories, lighting, small power, low voltage distribution and the electrical relocation of the existing Utilities plant to a new central location. The installation is carried out to an exceptional standard mainly in stainless steel due to the Hygiene Standards of a food factory. The project is due for completion March 2005.

International Achievement of the year Building Services Awards 2006

Project Management: Almarai

M&E Contractor: Dodd Group Ltd

Mechanical Design: 3CL

Electrical Design: Dodd Group Ltd

Contract Value: £15m

 

 

 

RNLI, Lifeboat College, Poole

The Royal National Lifeboat Institution's (RNLI's) new and highly specified Lifeboat College in Poole is the very first of its kind in the world.

rnliAs such, it benefits from a wide range of advanced electrical and mechanical systems and services. This prestige project was completed by Dodd Group South under the direction of Roger Denham and opened by Her Majesty The Queen.

Prinicipal Contractor: Dean and Dyball

M&E Contractor: Dodd Group Ltd

Architect: PBWC

Consultant: Faber Maunsell

Contract Value: £3.5m

 

 

 

 

Project Kimberly

Dodd Group's Northampton office are working to provide the mechanical and electrical services for the new 70,000 sq ft divisional headquarters for Hanson Building Products Ltd. at Stewartby near Bedford.

kimberly

Using the Clients existing brown field land, this state of the art three story building project aims to meet the highest quality standards whilst maintaining a sustainable heart with the use of natural ventilation, ground source heat pumps system to provide the total heating and cooling demands of the building, emergency stand-by generator and UPS back up.

 

Client: Hanson Building Products Ltd

Architects: TB Bennett

Project Managers: From4 Ltd

Construction Managers: Gardiner Theobald LLP Ltd.

 

 

 


 

renewable energy

Commercial

  • About Us
  • Construction
  • Property Care
  • Case Studies
  • Sustainability
  • Careers
  • News

Home Owner

  • About Us
  • Our Customers
  • Renewable Options
  • Tarrifs & Funding
  • Heating & Plumbing
  • Electrical
  • News
  • Links
#

Copyright Dodd Group 2010. All rights Reserved

  • Legal Notices
  • Accessibility
  • Contact
  • site Map
  • xml sitemap

Registered Address: Dodd Group, Stafford Park 13, Telford, Shropshire TF3 3AZ

nic eca safe microgeneration global