Bingham Leisure Centre

Bingham Leisure Centre

Bingham Leisure Centre and Office Block consists of 2no new 2 story buildings.

The Leisure Centre has a 25m Competition Pool ,a Learner Pool, Gymnasium, Community Hall, Kitchen and 3no large Fitness Studios.

The Office Building has 13no rentable offices over the 2 stories with each office having a kitchenette and accessible WC.

The Leisure Centre and Pools are heated via a variance of systems to suit each areas flexible occupancies. The Pool Water is generally heated via CHP Plant and Gas Fired Boilers whilst the Pool Area itself has is by an Air Handling Unit utilising Constant Volume (variable fresh air) via ventilation fabric ductwork at high level. The Studios have a VRF system providing both heating and cooling as required with Wet Change having Under Floor Heating and staircases/offices using a mixture of Heat Recovery Systems, Electrical Panel Radiators and Fan Coil Units.

The Offices are simply heated and cooled via individual VRF Systems with Landlord areas utilising Electrical Panel Radiators.

The Offices Energy Targets are offset by a Photovoltaic Array installed to the roof of the building.

Both buildings comprise of LED Dali Controlled Lighting, Emergency and External Lighting throughout.

In general Small Power, Pool Drowning Alarms, Access Controls, CCTV/Security, Data Public Announcement Systems/TV Systems and Life Safety Systems were all installed and commissioned under Dodd Group's Scope of Works.


Download this
Case Study as a PDF

Portrait   |   Landscape

News Signup

Sign up to receive our latest news