Madeley Academy was completed by the Dodd Group in 2009, and was fully designed and installed “in house” by Dodd Group.
The geothermal installation comprised of a horizontal trenched system, giving a capacity to the project of a 400 Kilowatt cooling load and a 200 Kilowatt heating load.