Theproject was an extension to the existing primary school & nursery block,with a new mechanical plantroom fit, external AHU, underfloor heating, Buildingmanagement system (BMS) internal & external Lighting, small power &data, Fire Alarm, Security & Lightning Protection.

ThePrimary School Extension & Nursery block was a single storey timber framedextension including 6 new Classrooms, Library, Staff room, Head Office,Reception Office, WC’s, Accessible Toilet, Common Area, Small Hall &Plantroom.

Thebuildings complete MEP installation consists of new automatic lighting, fire alarm,communication (data) and new mains LV power systems, derived from trunking, trayand basket containment installed flush within suspended ceilings in corridorsand plasterboard ceiling in rooms utilising associated support bracketry. Anextensive ICT and AV solution has been installed throughout the building, tosatisfy the requirements for the establishments use.

Mechanicalsupply and extract ventilation, fire damper, domestic HWS, CWS with local integratedcontrols and automatic environmental building management system. This requireda complete new plantroom installation complete with calorifiers, pumps andconnections to new Standalone Building Management System, Air Source Heat Pumpswere introduced to new system these were the source off controlling the new HWS& heating system.

Thelife safety fire alarm and security systems have been integrated with theexisting site wide base systems.

DoddGroup was responsible for the complete design, installation, testing and commissioningof the MEP systems.