Theproject was a partial refurbishment and conversion of a three storey accommodationblock, with a new mechanical plantroom fit out adding new main electricalincoming panels, external AHU compound and adding an external generator plantcomplete with automatic change over operation.
Theconversion including adding an armoury complete with gun cleaning and officespace including meeting rooms on the ground floor. The first floor is generallyoffice space; the second floor required a tidy up existing rooms adding someoffice space. Each floor had welfare facilities and secure server room wasprovided on the ground floor.
Thebuildings complete MEP installation consists of new automatic lighting, fire alarm,CCTV, standby generator, communication (data) and new mains LV power systems,derived from trunking, tray and basket containment installed flush within suspendedceilings in corridors and plasterboard ceiling in rooms utilising associatedsupport bracketry.
Anextensive ICT and AV solution has been installed throughout the building, tosatisfy the requirements for the establishments use.
Mechanicalsupply and extract ventilation, specialist air-conditioning, humidification,fire damper, domestic HWS, CWS and sprinkler systems installed throughout, withlocal integrated controls and automatic environmental building managementsystem. This required a complete new plantroom installation complete withcalorifiers, pumps and connections to site wide medium temperature heatingsystem.
Thelife safety including fire alarm, sprinklers and security systems have been integratedwith the existing site wide base systems.
DoddGroup was responsible for the complete design, installation, testing and commissioningof the MEP systems.