Name
B46A CHP Installation & HV Upgrade
Client
DIO
M&E Order Value
£320,000
Contractor
Dodd Group
Consultant
Anderson Green
Location
RAF Marham

To support the site wide energy import and carbon consumption, this project delivers the installation of a new 300kW gas fired CHP unit. To enable the installation a number of infrastructure and civil design works were required, this including the upgrade and renewable of a HV transformer switch centre, modification and re-configuration of the existing site energy centre, BMS upgrades along with new metering and monitoring systems.As part of the project, the client procured the CHP unit direct to enable the long lead time to be in parallel with the design and tender process, this to facilitate rapid deployment of the installation.Main Contractor role undertaken by Dodd Group, design developed by Anderson Green

This is a logo owned by Royal Air Force for RAF Marham. Further details: The image is the lead infobox image for the RAF Marham case study and is used for identification purposes.

Discover more major projects we’ve done in the past few years

From high security to high-rise, our expert teams have a wealth of experience in every kind of properties.