Shrewsbury Academy – Work In Progress

Shrewsbury

Home / Case Studies / Shrewsbury Academy – Work In Progress

Overview

Name
Shrewsbury Academy - Work In Progress
Client
DFE
M&E Order Value
£3.4 Million
Contractor
Tilbury Douglas Construction
ME Design Build
Dodd Group
Location
Shrewsbury

Dodd Group has secured the design and installation of MEP services at Shrewsbury Academy. The project includes the construction of a new 2 storey Science, Technology, Engineering & Maths (STEM) block, as well as refurbishment works throughout the current campus to allow the school to expand from 850 pupils to 1,200 pupils.

The scheme will incorporate the refurbishment of the currently vacant Sundorne Infant School site, which sits adjacent to the existing secondary school.

The STEM building incorporates a low-carbon natural ventilation solution using hybrid ventilation units coupled with opening windows.  In order to future proof the building, the heating system has been designed to operate at lower temperatures for the future incorporation of Air Source Heat Pumps. The second floor will house the science classrooms and therefore includes gas supply and specialist extraction.

The total MEP refurbishment of the old infant school includes new boilers, ventilation, BMS system, electrical distribution, LED lighting, fire alarm, and access and security all of which are fully interfaced with the main body of the school.

The refurbishment of the sports hall includes more energy efficient heating and lighting.

Image: Tilbury Douglas 

Discover more major projects we’ve done in the past few years

From high security to high-rise, our expert teams have a wealth of experience in every kind of properties.

Education
Education

The Kings Church of England School

Education

ADSLC

Education
Education