Assembly Building C – WORK IN PROGRESS

Bristol

Home / Case Studies / Assembly Building C – WORK IN PROGRESS

Overview

Name
Assembly Building C
Contractor
Galliford Try
Consultant
CPW
Value
£5.1 million
ME Design Build
Dodd Group
Location
Bristol

Dodd Group was appointed by Galliford Try Construction to under take the design and build for the MEP services on the Assembly Building C project. The project is a high end 11 storey office commercial building at approximately 11,950 Sqm.

Our involvement on the scheme was to take the completed RIBA stage 3 design through the RIBA Stage 4 technical design and into stage 5 and6. Dodd Group partnered with CPW to assist with this phase of the design and any Part L, energy analysis required. The project has been designed in full 3D Revit to assist with co-ordination and the Architects aspirations.

Key elements of the project are as follows.

Full CAT A Installation

Energy source is provided via the Bristol Heating Network.

Office areas contain full open soffits requiring a full surface installation of the M&E services, with detailed co-ordination of services with the Architects Aspirations.

Integration of Systems with Assembly Building A which was completed Mid 2021.

City Centre development located within a restricted area.

The Project is due for completion — 01-02-23

Discover more major projects we’ve done in the past few years

From high security to high-rise, our expert teams have a wealth of experience in every kind of properties.

Commercial & Industrial
Commercial & Industrial

Rolls Royce

Commercial & Industrial

Avonmouth Fire Station

Commercial & Industrial, Utilities

IFA2

Commercial & Industrial
Commercial & Industrial