The project comprised of anew build extension to replace the area of the existing school that was damagedby fire (Preschool, Reception, Year 1 and 2 classrooms and ancillaryaccommodation including offices, toilets, stores, entrance lobbies), includingrefurbishments works to certain existing areas and associated external works. Anew standalone preschool building was also constructed on the site adjacent tothe main school.
Dodd Group was responsible for the full design and deliveryof Fire Alarm/Detection, LV Distribution, Small Power, Lighting, InductionLoops, Intruder Alarm, Access Control, Dis WC Alarm, Telephone and Data,Lightning Protection, EV Car Charging, Photovoltaics, Gas Boiler LTHW Heating,Domestic Hot & Cold Water, Above ground drainage, Mechanical Ventilation,Hybrid Natural Ventilation, Building Management System(BMS) and Sanitaryware.
Image: Kier Construction