We have been employed by Kier to develop the design, installand commission all MEP Services and Sprinkler Works on this project with anorder value of £4.2M
Our work generally comprises a new build teaching blockwith site services interfacing with the existing primary and secondary schoolsalong with phased enabling type work for the provision of carparking andintegration of existing teaching blocks.
The new build has a net zero carbon requirement, and we’vedeveloped the scheme from stage 4 with Hoare Lea and Partners the incumbent MEPServices Consultant.
In consideration of this the MEP services design has beendeveloped with specific focus on the inclusion of renewable energy type systemsthat include a large PV Array, Natural Ventilation Systems, RainwaterHarvesting and Air Source Heat Pumps as the primary form of heating and hotwater services.
We commenced with Phase 1 carpark and bus stop works in Oct’22 with phase 2 new build commencing a year later in Oct’23 for 32 weeks andcurrently scheduled for completion on 01.07.24 following on with phase 3demolition and carparking for completion in Nov’24.
We are currently completing final fix works within the newbuild alongside the commencement of testing and commissioning, which iscurrently ongoing.