Dodd Group has secured the extension to the HMP Rye Hill, a Category B prison near Rugby, aspart of a Galliford Try £95m project. Thiscontract expands the prison’s capacity from 664 to 1126 inmates.
The project involves the design, supply, (modification ofexisting installation) installation, testing and commissioning of theMechanical and Electrical Services to the extended facility.
The mainworks package shall include the following:
- CompleteMEPH installation to a New Pre-Fabricated House Block consisting of 418 Cells.
- MEPHInstallations to a New Barrier Building, Activity Centre & Multi FaithBuilding.
- New ExternalServices Compound complete with Essential & Non Essential Switch Room, NewBack-up Generator, New Fire Tanks and External Cold Water Storage Tank withPre-Fabricated Pump House.
- New ExternalIntegrated Services and Modifications to Main Services Infrastructure inclusiveof CCTV, Car Park Lighting , New MUGA Lighting and External Perimeter/CompoundLighting.
- Specialistsystems include General alarms, Fire Alarms, Cell Call Systems, Fire MistingSystems, Microwave Detection Alarms, Smoke Ventilation, Under Floor Heating,Ventilation and Building ManagementSystems.
Works commence January 2023 with Completion expected March2025.