Overview

Name
PSBP North West
Client
EFA
M&E Order Value
£4.6m
Contractor
Interserve
Location
Multiple

The projects are part of the 7 school North West 3 Priority School Batch, which Interserve Construction secured with the pre-construction support from Dodd Group. The schools, all built consequtively over a wide geographic area are:

  • Mesna Lea PS, Worsley
  • Broadoak PS Worsley
  • Gorton Mount
  • Flowery Field

The projects were new build construction and required Dodd Group to manage the existing school decant including IT infrastructure to minimise disruption.The projectd included naturally ventilated design installation in all the classrooms.

Each project included a turn key solution on the ICT installation which includes a complete passive and active network as will as decanted legacy equipment. The end user were fully supported and trained by Dodd Group