The project comprises atwo-storey new build main school building which houses; general teachingclassrooms, practical teaching classrooms, Library, Kitchen & Dining Hall,Main Hall & Changing facility and ancillary areas such as Toilets andStaff/Admin spaces. All existing buildings on the site are to be demolishedwith the exception of the ‘LA Block’, which has recently been completed by theLocal Authority. Temporary accommodation shall be provided to allow the school tocontinue operating during the construction works.
The scheme is being developed inline with the DfE Output Specification 2021 and is required to achieve net-zerocarbon in operation (NZCiO) upon completion.
Dodd Group is delivering theM&E design utilising the in-house design team. The M&E services on thisproject consists of LV Distribution, Small Power, Lighting, FireAlarm/Detection, Disabled refuge alarm, Induction Loop, Access Control andVideo Intercom, CCTV, Telephone and Data, Lightning Protection, EV CarCharging, Photovoltaics, Sprinkler, Domestic Hot & Cold Water, CAT 5 Water,Sanitaryware, Above Ground Drainage, Air Source Heat Pump LTHW Heating,Mechanical Ventilation, Natural Ventilation, Refrigerant Cooling and BuildingManagement System (BMS).