Assembly Building C - WORK IN PROGRESS

Assembly Building C - WORK IN PROGRESS

Dodd Group was appointed by Galliford Try Construction to undertake the design and build for the MEP services on the Assembly Building C project. The project is a high end 11 storey office commercial building at approximately 11,950 Sqm.

Our involvement on the scheme was to take the completed RIBA stage 3 design through the RIBA Stage 4 technical design and into stage 5 and 6. Dodd Group partnered with CPW to assist with this phase of the design and any Part L, energy analysis required. The project has been designed in full 3D Revit to assist with co-ordination and the Architects aspirations.

Key elements of the project are as follows.

Full CAT A Installation

Energy source is provided via the Bristol Heating Network.

Office areas contain full open soffits requiring a full surface installation of the M&E services, with detailed co-ordination of services with the Architects Aspirations.

Integration of Systems with Assembly Building A which was completed Mid 2021.

City Centre development located within a restricted area.

The Project is due for completion – 01-02-23